Middle Drawbridge, HM Tower of London

NDB Construction Limited completed the construction of this replica draw bridge at HM Tower of London. This was a unique historical project and received a great deal of positive media publicity. Working to the exacting standards of Historical Royal Palaces we:

  • Dismantled the old draw bridge
  • Installed new foundations, piling and concrete slab
  • Erected a steel framework
  • Installed green oak cladding and timber decking
  • Installed the replica manual lifting mechanism
  • Carried out structural repairs to the ancient stone work and gates